Thesis

Run strip oral fabrica as a speed business—SKU density, short changeovers, audit-ready data.

GTM

Factory

Packaging-first

Wall KPIs

OEE ≥ 70% | FPY ≥ 92% | Changeover ≤ 4 h | Scrap ≤ 6% | Energy ≤ X kWh/kg dried.

30-Day Spine

Lock two golden recipes (robust/high-speed) → freeze laminate & seal window → PQ → first shipments → publish control plan.

Bottom line

Treat strip oral fabrica as a product–market-fit engine: standardize, evidence, and front-load packaging—speed and margin follow.