Thesis
Run strip oral fabrica as a speed business—SKU density, short changeovers, audit-ready data.
GTM
- Quote by thickness/basis-weight window + die layout + seal spec; surcharge for non-standard.
- Tiered MOQs: pilot / market test / scale, tied to pouch web width and tool utilization.
- Lead-time SLA: reorders in 10–15 business days with frozen BOM and locked recipes.
Factory
- Recipe governance: engineers change parameters; operators use presets; deviations auto-open CAPA.
- Inline proof: thickness/basis-weight → SPC → stop-on-trend; auto roll certificates/CoA per lot.
- Drying & web: multi-zone dew-point control; closed-loop tension & edge guide; antistatic + web cleaning before die-cut.
Packaging-first
- Standardize four-side-seal sachets; validate seal window early; offer easy-tear vs child-resistant with clear cost/lead-time deltas.
Wall KPIs
OEE ≥ 70% | FPY ≥ 92% | Changeover ≤ 4 h | Scrap ≤ 6% | Energy ≤ X kWh/kg dried.
30-Day Spine
Lock two golden recipes (robust/high-speed) → freeze laminate & seal window → PQ → first shipments → publish control plan.
Bottom line
Treat strip oral fabrica as a product–market-fit engine: standardize, evidence, and front-load packaging—speed and margin follow.